Friday, January 29, 2016

Bathroom Remodel

Catching up a little bit....this bathroom remodel occurred in our home almost a year ago now...well, a little less than that, but I have been lax in keeping this blog up to date.  The bathroom remodel was scheduled to be done after our kitchen remodel was complete.  The kitchen was done two summers ago and last spring...the bathroom remodel commenced.  The transformation was incredible.  The former bathroom....in a word.....was UGLY.  It was outdated....worn out and just plain a disgrace!  It totally gutted the room down to the studs and cieling joists and started over.  New drywall, new floor and cieling...new tub, toilet and sink.....tiled the bath surround, fabricated the rooms trim...moved some plumbing to better be protected from the piping freezing and built the vanity, mirror, a radio shelf and the cabinet in my shop.  In total, the entire job took approximately three weeks from start to finish and was definitely well worth the effort and temporary inconvenience!  That all being said....here are a few pictures of the stuff I built for the bathroom remodel:



No comments:

Post a Comment